¤ Click for bigger images. (Opens as a new window)
 | the lab (24th Apr) |  | the lab (10th May) |
 | the lab (10th May) |  | the lab (11th May) |
 | drafts are set (11th May) |  | the lab (12th May) |
 | measuring room (14th May) |  | the lab (16th May) |
 | wrong desks were carried in (21st May) |  | rotatory evaporator has arrived (22nd May) |
 | cartons of cartons of cartons... (25th May) |  | unpacking the equipments (28th May) |
 | still under construction (29th May) |  | the lab (31th May) |
 | shared PC etc. (1st June) |  | with the new desks (2nd June) |
 | with the new desks 2 (2nd June) |  | moved out (4th June) |
 | the lab (5th June) |  | measuring equipments (5th June) |
 | a desk of the member (5th June) |  | the lab (29th June) |
 | experiment at last! (29th June) |  | |